Presentations

"The role of the client in industrialized construction in wood"

What to do...

  • study means of control
  • means of control ⇔ demands
  • new/changed means of control and tools ⇒ “quality”

Industrialized construction = new demands?

  • quality (+)
  • deadlines (+)
  • calculations (+)
  • agreements (-)

Industrialized construction - characteristics

  • process (not project)
  • experience feed-back
  • follow-ups
  • exact definitions and control
  • planning logic for process not project
  • long-time relationships with sub-contractors

⇒ A lot of possibilities to meet new demands, but still the market hesitates…

The client - "feeling insecure"

  • untested
  • few references
  • poorly documented


Quality and technical solutions need to be a guaranteed and secure.

Communication

:-/:-? or :-D:-D

customer's needs ⇔ production process demands


Needs = ?
Means of control = ?
Why needs?
Why means of control?


Process demands = ?
Why demands = ?




Flexibility

  • Product flexibility
  • Off-site flexibility
  • On-site flexibility
  • Post-construction flexibility

Product flexibility

For the clients - being able to get what they want

What? Function :Structural (engineering), design (aesthetics)

Off-site production process (manufacturing) flexibility

For the clients - being able to order, and change order, during the course of production

When? Time

→ consequences (in production)
  • cost
  • quality
  • time (delay)


→ consequences (for client, due to consequences in production)
  • price
  • quality
  • delivery
  • interference

On-site production process (assembly) flexibility

For the clients - being able to get it in the way they want it

How? Interference: time on site, space, logistics

Management (administration, maintenance, rebuild, change) flexibility

For the clients - being able to get what they want, over time (throughout the life of the construction)

What? Function: maintenance (structural, design), interference (structural, design), Δ(structural, design)

 
susanne/presentations_-_work_in_progress.txt · Last modified: 2008/10/16 18:37 by sengstrom     Back to top