Presentations
"The role of the client in industrialized construction in wood"
What to do...
- study means of control
- means of control ⇔ demands
- new/changed means of control and tools ⇒ “quality”
Industrialized construction = new demands?
- quality (+)
- deadlines (+)
- calculations (+)
- agreements (-)
- …
Industrialized construction - characteristics
- process (not project)
- experience feed-back
- follow-ups
- exact definitions and control
- planning logic for process not project
- long-time relationships with sub-contractors
- …
⇒ A lot of possibilities to meet new demands, but still the market hesitates…
The client - "feeling insecure"
- untested
- few references
- poorly documented
- …
Quality and technical solutions need to be a guaranteed and secure.
Communication
⇔
or
⇔
customer's needs ⇔ production process demands
Needs = ?
Means of control = ?
Why needs?
Why means of control?
Process demands = ?
Why demands = ?
Flexibility
- Product flexibility
- Off-site flexibility
- On-site flexibility
- Post-construction flexibility
Product flexibility
For the clients - being able to get what they want
What? Function :Structural (engineering), design (aesthetics)
Off-site production process (manufacturing) flexibility
For the clients - being able to order, and change order, during the course of production
When? Time
→ consequences (in production)
- cost
- quality
- time (delay)
→ consequences (for client, due to consequences in production)
- price
- quality
- delivery
- interference
On-site production process (assembly) flexibility
For the clients - being able to get it in the way they want it
How? Interference: time on site, space, logistics
Management (administration, maintenance, rebuild, change) flexibility
For the clients - being able to get what they want, over time (throughout the life of the construction)
What? Function: maintenance (structural, design), interference (structural, design), Δ(structural, design)